40 |
Jack-Up Rig Positioning at UNAM-CC
Platform (WD=42m) |
Dewalyes – Exxon Mobil |
Nov,2017 |
41 |
Marine Debris and Jack-up approach Survey
(Adjacent to NEFS for JUB SSS Installation Works) (WD=12m) |
Technixs / SPDC |
July, 2017 |
42 |
Bathymetry and Wreck Survey 12km
(WD=19m) |
Humber/ Aveon Offshore |
June, 2017 |
43 |
Search and recovery Survey (WD=7m) |
Nigerian Navy |
March, 2017 |
44 |
Meren Platform cable Lay Survey 15km
(WD=14m) |
Chevron/ Era J |
March, 2017 |
45 |
24’’ Okan Gas Import Pipeline post- installation survey Chevron Field 42km
(WD=17m) |
Ranger Subsea / Chevron |
February 2017 |
46 |
24’’ Okan Gas Import Pipeline installation
positioning survey support Chevron Field 42km (WD=17m) |
Ranger Subsea / Chevron |
Dec 2016 –
January 2017 |
47 |
24’’ Okan Gas Import Pipeline pre- installation Chevron Field 42km (WD=42m) |
Ranger Subsea / Chevron |
Nov, 2016 |
48 |
OQPP Onshore Pipeline and Geotechnical
Survey 18.4km |
Exxon Mobil / Deltaafrik |
Oct- Nov 2016 |
50 |
12’’ subsea Pipe lay Positioning Support from South bank to NEFS Conoil Field
21km (WD=22m) |
Ranger Subsea / Conoil |
February 2016
Oct 2016 |
51 |
Subsea Cable shore Land, Protection and Burial at Goshen Beach Lagos 21km
(WD=20m) |
Vewat / SAT 3 Consortium |
March, 2015 |
52 |
Subsea Cable Lay Positioning Support at Lagos Offshore for SAT 3 Consortium
21km (WD=20m) |
Humber Marine / SAT 3 Consortium |
December, 2015 January |
53 |
Pre-Lay Survey for Fiber Optics Subsea Cable Lay at Lagos Offshore for SAT 3
Consortium 21km (WD=20m) |
Vewat /SAT3 Consortium |
November, 2015 |
54 |
Post Wreck Survey of Dibi Survey |
Chevron Nig Ltd/ Humber
Marine |
November, 2015 |
55 |
12’’ subsea Pipe lay Positioning Support
from South bank to NEFS Forcados Field 6.5km (WD=11m) |
Gladtrico /OPI/SPDC |
August, 2015
February 2016 |
56 |
Subsea Cable Lay Positioning Support at
Forcados Field 8.1km (WD=11m) |
Natony / OPI/SPDC |
June, 2015 |
57 |
12’’ Pipeline route survey from South bank
to NEFS Forcados Field 6.5km (WD=11m) |
OPI / SPDC |
March, 2015 |
58 |
Pre-Lay Survey for Subsea Cable Lay at
Forcados Field 8.1km (WD=11m) |
Natony / OPI/SPDC |
February, 2015 |
59 |
Scarabeo 3 Semi-Submersible Rig Position
@ OKD-5 Okwori Field(WD=141m) |
Addax Petroleum / Eraldom
Nigeria |
December,2014 |
60 |
Subsea Cable Lay pre-installation survey at
Forcados Field 6.5km (WD=11m) |
OPI / SPDC |
November,2014 |
61 |
Scarabeo 3 Semi-Submersible Rig Position
@ OKD-27 Okwori Field (WD=153m) |
Addax Petroleum / Eraldom
Nigeria |
October,2014 |
62 |
Pipeline route survey of Trans Ramos
pipeline Agge Filed 6.5km (WD=14m) |
Nigerdive / SPDC |
October, 2014 |
63 |
Escravos River pipeline crossing
survey8.5km (WD=21m) |
Nigerdive / SPDC |
September, 2014 |
64 |
Scarabeo 3 Semi-Submersible Rig Position
@ Asha 6 Okwori Field (WD=148m) |
Addax Petroleum / Eraldom
Nigeria |
August,2014 |
65 |
Topographical Survey of Flowline and Well
Fix of Well O,N,P in Oredo Field 16.5km |
Nigerian Petroleum Development
Company (NPDC) |
July, 2014 |
66 |
Scarabeo 3 Semi-Submersible Rig Position
@ ok-14 Okwori Field (WD=156m) |
Addax Petroleum / Eraldom
Nigeria |
June,2014 |
67 |
Offshore pipeline Rout Survey at Agee
8.5km (WD=14m) |
SPDC/ Nigerdive Ltd |
May,2014 |
68 |
Topographical Survey of Access road and
Hydrographical Survey of Orashi River |
Nigerian Petroleum Development
Company (NPDC) |
April, 2014 |
69 |
Swath Bathymetric Survey of Escravos
Entrance 21.5km (WD=28m) |
NPA / Humber Marine Werks
Company Ltd |
March, 2014 |
70 |
Scarabeo 3 Semi-Submersible Rig Position
@ ok-D10 Okwori Field (WD=162m) |
Addax Petroleum / Eraldom
Nigeria |
February,
2014 |
71 |
Offshore Pipeline Route Survey |
MG3 / Afren |
January, 2014 |
72 |
Scarabeo 3 Semi-Submersible Rig Position
@ ok-15 Okwori Field (WD=161m) |
Addax Petroleum / Eraldom
Nigeria |
November,
2013 |
73 |
Scarabeo 3 Semi-Submersible Rig Position
@ okd-2 Okwori Field (WD=154m) |
Addax Petroleum / Eraldom
Nigeria |
September,
2013 |
74 |
Scarabeo 3Semi-Submersible Rig Position @
ok-29 Okwori Field (WD=152m) |
Addax Petroleum / Eraldom
Nigeria |
August, 2013 |
75 |
Geophysical / Seabed survey of Warri channel to Excravos Fairway Buoy ( 228km)
(WD=28m) |
NPA / Humber Marine Werks Company Ltd |
March, 2013 |
76 |
Swath Bathymetric Survey of Escravos
Shipping Channel Entrance 48km (WD=21m) |
NPA / Humber Marine Werks
Company Ltd |
December,2012 |
77 |
Rig Positioning @ Okono I (WD=110m) |
NPDC |
September, 2012 |
78 |
Sea Bed / Geophysical site survey for Rig
Positioning @ Okono H & I (WD=109m) |
Nigerian Petroleum Development
Company. |
August, 2012 |
79 |
Geo-hazard survey For Rig Positioning of
Oso PP (WD=21m) |
Exxon Mobil /GOSL |
May, 2012 |
80 |
Geotechnical Soil Investigation for the
Transmission Tower Lines. |
PHCN/TCN/IPP (Sub-contract
Miden Systems Ltd.) |
July,2011 |
81 |
Geotechnical and Topographic Investigation of Ajaokuta-Abuja-Kano-Katsina Gas pipeline Route Survey. 231km |
Federal Ministry of Petroleum Resources, Sub-contract from Atlas International Engineering
Services |
2011 |
82 |
Topographic Survey for Gas Supply
Expansion Project (GSEP). |
Chevron Nigeria Limited /
Hyundai Heavy Industries, contract awarded by Worley Parsons R & E Houston |
2010 |
83 |
Near Shore Geophysical for Critical Crude pipeline replacement project. |
Mobil Producing Nigeria Unlimited. Contract awarded by
Deltaafrik Engineering Limited |
2009 |
Next page
|
Nigerian News
Guardian Newspapers ThisDay Newspapers The Punch
Newspapers Sunnews Newspapers Vanguard Newspapers
Tribune
Newspapers
Our Vision
Our vision is to be the most reputable and profitable energy Service Company in the
world.
Our Mission Statement
To our:
-
Employees: Provide the opportunity to learn, grow and enjoy the value created by their effort.
-
Customers: Provide leading edge solutions, act with urgency/integrity and most of all develop long-term relationships by
delivering memorable results.
-
Stakeholders: Create value by achieving returns that meet or exceed their expectations
Our Policy Statement
The short and long term aim of GEOCADINAL INTEGRATED SERVICES LIMITED is to become
the industry leader in all our product lines through distinction in efficiency, technology, Quality Health Safety and Environment.
In pursuing this objective, GEOCADINAL INTEGRATED SERVICES LIMITED is committed to
achieving superior satisfaction levels for its external and internal customers through Quality Management while complying with applicable standards and specifications.
|