Current and Executed Projects
Geocadinal Integrated Services
Limited has over Thirty Five (35) past and present projects, ranging from Surveying, Positioning, GIS, Borehole Drilling and Completion, Geotechnical Site
Investigation, Geophysical survey and logging, water treatment system, water storage system and distribution and Environmental Services all over the country
particularly in Niger Delta Region and other parts of the country.
We are particularly keen on this Trans Nigeria Gas Pipeline Project
because we pioneered and undertook the all the field works in the first phase of this project called Ajaokuta-Abuja-Kano-Katsina pipeline route survey and
Above Ground Facilities Geotechnical. (AAKK) By Atlas Engineering Nigeria Limited in February 2011.
LIST OF ONSHORE/OFFSHORE SURVEYING AND POSITIONING PROJECTS
NO |
DESCRIPTION |
CLIENT |
YEAR |
1 |
Rig Positioning of Borr Gerd from Asasa VA to
West Pindown Area (WD=42m) |
Borr Drilling – Exxon Mobil |
June 2020 |
2 |
Subsea Pipeline / Jacket Inspection and 3D Visualization Survey AT Forcados Field 6.5km
(WD=12m) |
Stride Energy /SPDC |
June,2020 |
3 |
Rig Positioning of Borr GROA from Oyot A to
West Pindown Area (WD=43m) |
Borr Drilling – Exxon Mobil |
May 2020 |
4 |
Rig Positioning of Trident XIV from OSO RH
to West Pindown Area (WD=21m) |
Shelf Drilling / Exxon Mobil |
May 2020 |
5 |
12’’ subsea Pipe lay and SBM Installation Survey Support from Beach to 15km
Offshore Lagos (WD -19m) |
Bright Waters / Pinnacle Oil |
Ongoing |
6 |
Re-Establishment Survey of Isoko TTBR-1 Well Location, including Access Road And
Borrow Pit in Isoko Field, OML 26 (2.4km) |
Nigerian Petroleum Development Company (NPDC) |
April, 2020 |
7 |
PI, FP Survey Of Proposed WNGD-1 Well Location, Campsite And Route Survey Of Access Road/Flowline ROW in Isoko Field,
OML 26 (3.5km) |
Nigerian Petroleum Development Company (NPDC) |
March, 2020 |
8 |
Subsea and Platform Face Survey for Cluster
JA, Cluster 1 and NEFS (WD=12m) |
Michharry/ SPDC |
Feb, 2020 |
9 |
Rig Positioning of Borr Gerd at Asasa VA
(WD=42m) |
Borr Drilling – Exxon Mobil |
January 2020 |
10 |
Jack-Up Rig Positioning at OEFS Platform
(WD=12m) |
Dewalyes – SPDC |
Dec 2019 |
11 |
Rig Positioning at EA DPJ Platform
(WD=42m) |
Borr Drilling – SPDC |
Nov 2019 |
12 |
Rig Positioning at Asasa VB |
Borr Drilling – Exxon Mobil |
Sept 2019 |
13 |
Pre-Engineering Survey Of proposed 12” Multiphase Export Pipeline AMD2 and IKD1 and 12” Water Injection Pipeline AMD3 and
IKD1 at IKIKE Field within OML99 (AMENAM-KPONO). 43km (WD=42m) |
GEMS / Deltatak / Total E&P |
Sept 2019 |
14 |
Topographical, Aeria Mapping and Geotechnical Soil Investigation of BUA
Refinery Site in Ibeno, Akwa Ibom (48 Ha) |
BUA Refinery |
July,2019 |
15 |
Habour Survey for ship anchorage at Lagos Bar
(24km x15km) |
Nigeria Port Authority |
July,2019 |
16 |
Subsea Pipeline / Jacket Inspection (32km) |
Rosesmith / Agip |
June,2019 |
17 |
Rig Positioning at Oyot A (WD=43m) |
Borr Drilling – Exxon Mobil |
June,2019 |
18 |
Rig Positioning at Usari FC (WD=32m) |
Borr Drilling – Exxon Mobil |
April, 2019 |
19 |
Jack-Up Rig Positioning at OSO B Platform
(WD=21m) |
Dewalyes – Exxon Mobil |
April 2019 |
20 |
Meji subsea Flexible pipe lay Survey Support
37km (WD=11m) |
Marine Platforms/ Chevron |
March, 2019 |
21 |
Jack-Up Rig Positioning at CLUSTER,6,7,2,4
Platforms (WD=11m) |
Dewalyes – SPDC |
March, 2019 |
22 |
Jack-Up Rig Positioning at EDOP QA
Platform(WD=43m) |
Dewalyes – Exxon Mobil |
February, 2019 |
23 |
Jack-Up Rig Positioning at NEFS
Platform(WD=12m) |
Dewalyes – SPDC |
February, 2019 |
24 |
As-Built/ As-Trench Survey for SSSGEP
Pipeline 15km (WD=42m) |
Saidel /SPDC |
February, 2019 |
25 |
Geotechnical Survey of SBM 1&3 for BOP Restoration Project (WD=41m) |
OIS/ Exxon Mobil |
January, 2018 |
26 |
Identification And Charting Of Abandoned Offshore Platforms And Structures – Western
Zone – A 20km x20km (WD=42m) |
NIMASA |
January, 2019 |
27 |
6" X 6km Cluster JA – North bank CPF
FYNAG Flowline (WD=14m) |
Micharry /SPDC |
January, 2019 |
28 |
Free Span Survey for Southern Swamp Sales
Gas Evacuation Pipeline 15km (WD=42m) |
Saidel /SPDC |
December,2018 |
29 |
Pre-Construction Survey for Meji Flexible
pipe Line 37km (WD=11m) |
Marine Platforms/ Chevron |
December,2018 |
30 |
Pre-Construction Survey 20’’ Meren-Okan
WYE Pre Installation Survey 4km (WD=14m) |
DeltaTek Offshore/ Chevron |
December,2018 |
31 |
16’’ SSSGEP Pipe lay Survey Support |
Saidel /SPDC |
October,2018 |
32 |
Geophysical Survey of SBM 1&3 for BOP
Restoration Project 4x4km (WD=41m) |
OIS/ Exxon Mobil |
September, 2018 |
33 |
Bathymetric and Metocean Survey of Ondo
Free Trade Zone 43km (WD=750m) |
Ondo State Govt |
August, 2018 |
34 |
Pre-Construction Survey for Southern Swamp
Sales Gas Evacuation Pipeline 15km (WD=42m) |
Saidel /SPDC |
August, 2018 |
35 |
Usan Subsea Inspection (WD=962m) |
Exxon Mobil/ GMT |
May,2018 |
36 |
2D High Resolution Survey
6x6km (WD=42m) |
Deltaafrik / Exxon Mobil |
April,2018 |
37 |
Erha Subsea Asset Inspection
(WD=750m) |
Exxon Mobil/ GMT |
March,2018 |
38 |
Jack-Up Rig Positioning at UBIT GN Platform
(WD=42m) |
Dewalyes – Exxon Mobil |
February 2018 |
39 |
Jack-Up Rig Positioning at UBIT GN Platform
(WD=42m) |
Dewalyes – Exxon Mobil |
January 2018 |
40 |
Pipeline route Survey for Southern Swamp
Sales Gas Evacuation Pipeline 15km (WD=22m) |
Marine Platform / SAIDEL/ SPDC |
On-going |
38 |
Jack-Up Rig Positioning at Estuary Cluster
(Well-020) (WD=8m) |
Dewalyes – SPDC |
December, 2017 |
39 |
OQPP Near shore / Onshore Pipeline Route
Survey 12km (WD=8m) |
Deltaafric / Exxon Mobil |
Dec, 2017 |
|
Nigerian News
Guardian Newspapers ThisDay Newspapers The Punch
Newspapers Sunnews Newspapers Vanguard Newspapers
Tribune
Newspapers
Our Vision
Our vision is to be the most reputable and profitable energy Service Company in the
world.
Our Mission Statement
To our:
-
Employees: Provide the opportunity to learn, grow and enjoy the value created by their effort.
-
Customers: Provide leading edge solutions, act with urgency/integrity and most of all develop long-term relationships by
delivering memorable results.
-
Stakeholders: Create value by achieving returns that meet or exceed their expectations
Our Policy Statement
The short and long term aim of GEOCADINAL INTEGRATED SERVICES LIMITED is to become
the industry leader in all our product lines through distinction in efficiency, technology, Quality Health Safety and Environment.
In pursuing this objective, GEOCADINAL INTEGRATED SERVICES LIMITED is committed to
achieving superior satisfaction levels for its external and internal customers through Quality Management while complying with applicable standards and specifications.
|